21 April 2011
Easter and Some Things Finished
It's almost Easter and I am happy to report that a couple of major tasks have been completed since I last updated this blog.
First, all of the ceilings are complete in the house. It is much more comfortable as well as more pleasing to look at. By the way, the 3 dogs don't seem to care as long as their dogie door works properly.
And, more importantly, the mobile crane came two weeks ago and lifted over 1,000 pounds of steel into an upright position to complete my 65 foot radio tower. I have included a montage of images. Pictures are: tower ready, truck ready, still ready, diesel problems, top 40 ft. going up, rigger bolting together, rigger at center of tower, house roof below truck bed, waiting for SteppIR beam, and 3 amigos on watch. CLICK ON THE IMAGE ABOVE FOR A LARGER IMAGE.
Take care, be well and be happy!
Subscribe to:
Posts (Atom)